
Residential Asphalt Shingle Roofing For Austin, TX
Complete GAF Roofing Systems With Leak Barrier, Deck Protection, Proper Ventilation, And 50-Year Warranty Coverage
Shingles Are The Part You See. We Build Everything You Don’t.
Asphalt shingle roofing is the most common system on homes in Austin. But most homeowners don’t realize a replacement means more than just swapping out the shingles on top. It’s rebuilding the entire system.
I’m Michael Boy, owner of Wolfpack Roofing & Exteriors, and I personally perform your roof evaluation. There’s no sales rep handing your project to a crew you’ve never met. You get a straight answer about what your roof actually needs, a clear explanation of your options, and a complete GAF system installed by the same dedicated crew on every reroof job.
Whether your roof is aging out, has damage from an Austin hailstorm, or you’re finally replacing the original shingles, we build the full system correctly the first time using trusted products.
Wolfpack’s Approach To Asphalt Roof Replacement
The difference between a roof that lasts and one that doesn’t usually comes down to two things: the system being installed and who’s making sure it’s done right.

Every Wolfpack shingle roof replacement is built as a complete GAF roofing system. That means every component — shingles, underlayment, flashing, ventilation, and accessories — comes from the same manufacturer and is installed to support the warranty.
We don’t mix and match to cut costs.
I lead every inspection, walk you through what your roof needs, and explain your options clearly. This means I don’t recommend replacement when a repair is the right call.
Best for: homeowners who want a long-term system with real warranty backing and the documentation to prove it.

Every replacement goes all the way down to clean wood — no layovers, no shortcuts, no leaving the original felt in place. Temo’s crew does the work, start to finish. Not whoever’s available that day. Not a rotating lineup of subs. The same people, every time, always professional.
Best for: homeowners replacing an aging or failing shingle roof who want a full system install done right and backed by a real warranty.
What Goes Into A Wolfpack Shingle Roof
Every component matters. Here’s what we install, from the deck up.
Full Tear-Off To Clean Deck
Every replacement goes down to bare wood. What’s under there matters, and we find out what it is before anything else goes on.
GAF Leak Barrier
Self-adhering ice and water protection at the valleys and penetrations — the places water always finds first.
GAF Roof Deck Protection
Synthetic underlayment over the entire deck surface. Not felt. Not whatever was cheapest. GAF’s own underlayment, Feltbuster, installed correctly.
GAF Starter Strip
Purpose-built starter at the eaves and rakes, not cut-down shingles, not skipped. The first course matters as much as everything above it.
GAF Shingles
Architectural shingles installed to manufacturer nailing specs. No shortcuts on fasteners, no skipped rows, no mixed products.
GAF Ridge Cap + Ventilation
Proper ventilation is engineered per the roof. Under-ventilated Austin roofs age faster and fail sooner. Ridge cap goes on last, matching the shingle system.
Warranty Options

All three tiers are built on the same full GAF system — same shingles, same underlayment, same accessories. The warranty level changes. The quality of the install doesn’t. Prices effective July 1, 2026.
System Plus
Limited Warranty
- Timberline NS, HDZ, HDZ RS
- Timberline UHDZ, AS II
- Designer Shingles
- Lifetime* + 50-year non-prorated
- Replacement material & labor
- Tear-off
- Disposal for covered repairs (new)
None
Silver Pledge™
Limited Warranty
- Timberline NS, HDZ, HDZ RS
- Timberline UHDZ, AS II
- Designer Shingles
- Lifetime* + 50-year non-prorated
- Replacement material & labor
- Tear-off + disposal for covered repairs
10-year non-prorated (NS, HDZ, HDZ RS)
15-year non-prorated — new for UHDZ, AS II & Designer
Golden Pledge®
Limited Warranty
- Timberline HDZ, HDZ RS
- Timberline UHDZ, AS II
- Designer Shingles
- Lifetime* + 50-year non-prorated
- Replacement material & labor
- Tear-off + disposal for covered repairs
Lifetime* — new
25-year non-prorated (HDZ, HDZ RS)
30-year non-prorated (UHDZ, AS II, Designer)
*“Lifetime” means the life of the original structure. GAF warranty terms apply. Wolfpack leads every roof with the Golden Pledge — it’s our standard, not our upsell. If price is the driving factor, we can work down from there, but we’ll always tell you what you’re trading off.
Shingle Roofing Work Across Austin, TX
A look at completed GAF asphalt shingle roof replacements across Austin homes, showing how the system comes together in real-world conditions.
Hear From Happy Wolfpack Customers
From the first call to the finished roof, here’s what people share about working with Wolfpack.
The customer service spoke volumes!…
Reached out to Wolfpack for an inspection, Michael was extremely responsive and easy to schedule with. He came out, spoke with us, and was great at explaining what we were concerned about. Luckily we didn’t need a repair, but if we ever do it’ll be 100% Wolfgang! The customer service spoke volumes!
Gutters aren’t the most exciting of home projects, but when…
I had a great experience recently with Wolfpack Roofing and Exteriors for gutter installation and repair. Easy communication and appointment setting, a thorough walk around and examination of the gutter issues the house was experiencing and some creative problem solving and easy tweaking, which resulted in me not having to replace an entire section. The work estimate was very reasonable, as was getting the project scheduled. The work crew was nice, professional and clean. They were well informed about the work they’d be doing and Michael checked in during the project and afterwards for a final look at the completed work. All of the recent rain has tested the gutters and everything is working well, which is so much better than before! I had existing gutters rehung to correct the slope, a downspout relocation, a new long gutter and downspout installed where the house had never had one before and a tricky roof corner fixed that used to always overflow. Gutters aren’t the most exciting of home projects, but when it’s pouring outside it’s so nice to have rainwater going where it’s supposed to and not eroding everything around the house.
We were extremely happy with the quality of service and…
Our yard is filled with beautiful live oaks that had not been kept prior to us moving in three years ago. Wolfpack Roofing came in and walked through discussing the condition of each tree, where trimming would be needed, and detailed suggestions. Due to the large quantity of trees in our yard this was not an easy task, but Wolfpack didn’t didn’t treat it as such and even gave us a quick response time and completion of the project. We were extremely happy with the quality of service and will definitely use them again for future tree trims.
Asphalt Shingle Roofing Questions
Do I Need To Be Home During My Roof Replacement?
I’m there at the start. That’s when the roof comes off, and you find out what’s actually underneath. After that, Temo’s crew works through the job. Nico ensures there are no mistakes or issues throughout the job and does the final inspection for quality. You don’t have to be there, but you’re welcome to be. We’ll walk you through everything we found and everything we did.
How Long Does A Shingle Roof Last In Austin?
A GAF system typically performs well for 25–30 years under Austin conditions. The variables are installation quality, ventilation, and whether hail damage gets addressed promptly. With us, the 50-year Golden Pledge warranty is your floor. The actual lifespan depends on how well the system was built.
I Got A Cheaper Bid From Another GAF Contractor. What’s The Difference?
Most likely, they’re meeting the minimum accessory count required to qualify for the warranty, not building the full system. Or they’re not registering the warranty at all. We’ve torn off roofs from large, well-known Master Elite contractors and found they left the original felt in place, which voids the workmanship warranty entirely. Keeping up with multiple crews coming in and out of your workforce allows for these lapses in quality. You have no way of knowing what’s up there.
We do the job with the same crew every time, register the warranty, and it arrives directly from GAF.
What Areas Around Austin Do You Provide Roof Replacement?
Our roofing services extend in and around Austin, TX, including Meridian, Circle C, Westlake, Belterra, and more. See our full list on our Service Areas page.
What Other Services Do You Offer?
Besides roofing, we offer other exterior services, like stucco repair, masonry repair, gutter, gutter guards, and exterior painting.
What’s The Difference Between A Shingle Roof And A Shingle System?
A shingle roof is what most roofers install — shingles on top of whatever underlayment they happen to have on the truck. A shingle system is every component engineered to work together: leak barrier, deck protection, starter strip, shingles, ridge cap, and proper ventilation — all from the same manufacturer, all installed to spec.
The warranty only covers the system. If one component is wrong or missing, the rest of the warranty is compromised.
When Do I Pay For My Roof Replacement?
When the job is done. No deposit, no money upfront. You pay after the work is complete, after you’ve walked through it, and after we’ve confirmed the scope was delivered. That’s the policy and the principle.
Why Do You Only Use GAF? Isn’t That Limiting?
It’s the opposite. Knowing one system deeply and building it correctly every time is better than figuring out how to make three different manufacturers’ products work together. We know GAF, we trust GAF, and we build the full system, not a mix-and-match roof with cheap accessories to save margin.
Schedule Roofing & Exterior Work Done The Right Way
Wolfpack Roofing & Exteriors provides roof replacement, repair, storm damage, and exterior services in Austin, TX, including gutters, masonry repair, stucco repair, flat roof repair, and exterior painting. Every project is handled with specialized crews, no shortcuts, and no pressure. Schedule your consultation for clear answers and work done right.




